1. Home
  2. Portfolio
  3. Legacy-to-ERP Data Migration

Case Study

Automated Legacy-to-ERP Data Migration

An organization moving to a new ERP needed to migrate a large volume of complex, frequently changing XML data from its legacy systems into the ERP's database, within a strict deadline and with a small team.

We replaced hand-written migration scripts with an automated, metadata-driven ETL pipeline that adapted to changing source structures, validated every record before loading, and could be re-run whenever needed.

Data Migration ETL ERP

The Challenge

Changing data, a fixed deadline

Scripts written by hand for each source format could not keep up with the volume and variety of the legacy data.

Unscalable Custom Scripts

Hand-coded developer scripts could not keep pace with constantly changing XML schemas.

Resource Constraints

The organization faced tight head-count limits and a rigid delivery window.

Data Quality Risks

Inconsistent structures and missing fields threatened to break the target ERP ingestion process.

The Solution

A pipeline that adapts instead of breaking

We designed the migration as a configurable pipeline, so changes in the source data meant updating metadata rather than rewriting code.

Automated Schema Adaptation

We built a metadata-driven pipeline that dynamically detected and adapted to changing XML structures without manual code rewrites.

Metadata-Driven Field Mapping

Source-to-target mappings were defined as configurable metadata rather than code, so complex field mappings across many target tables could be reviewed and changed quickly.

Built-in Data Validation

Automated data quality checks flag anomalies, validate formats, and route bad data to error-handling feedback loops prior to target loading.

Reconciliation and Audit Trail

Every load is reconciled against its source, with record counts, rejected rows and transformation logs kept for review and sign-off.

Reusable Framework

A modular architecture allows the team to re-run and adjust iterative migrations easily, including after go-live.

Results

Delivered on time, ready to run again

On-Time Delivery

The migration met its strict deadline without schedule overruns.

Reduced Labor

The complex multi-table mapping was completed with a smaller-than-planned project team.

Trusted Data in the ERP

Validation and reconciliation before loading meant the new ERP went live with clean, consistent data.

Long-Term Reusability

A one-off migration script became a repeatable, configurable migration template for future rollouts.

Conclusion

By treating the migration as a reusable, metadata-driven pipeline rather than a one-off script, the organization moved its legacy data into the new ERP on schedule, with validated and reconciled data and a smaller team than planned. The same framework now supports future rollouts and iterative data loads, turning a high-risk, one-time project into a repeatable capability.

Planning a system migration?

Explore our work

Browse more of the projects we have delivered.

View case studies

Talk to us

Tell us where your data lives today and where it needs to go.

Contact Us

Stay updated

Get our next case study when it is published.